One change, start to finish

A real recorded run: the guest network's only uplink goes down.

The walkthrough

Four steps from change to explanation

Screens from the run dashboard.

  1. 1

    Step 1

    The change

    A link on the campus network fails. The 17 devices and links it touches are highlighted.

    Guest uplink failure
    The run dashboard: risk gauge and the affected part of the campus network
  2. 2

    Step 2

    Before and after

    The same route is traced on the test copy before and after the change. Guest1 can no longer reach staff1.

    What happened between guest1 and staff1
    Route between guest1 and staff1 before and after the change
  3. 3

    Step 3

    The risk score

    The score is built from four factors, shown as it grows. Policy rules that broke lift the band to critical.

    How the score became critical
    How the score of 43 is built from its factors and lifted by hard rules
  4. 4

    Step 4

    The explanation

    A local model writes it in plain words. Every claim points to a line of evidence.

    Plain-language explanation
    Plain-language explanation with evidence references

More runs

Five more recorded runs

Each card opens the full dashboard.

Example run: risk low, score 14.6Thumbnail of the topology with 3 affected nodes highlighted, and the risk score 14.6 out of 100 in the low band.Low risk14.63 of 26 nodes affected0100
Campus networkCore mesh link failure

A link between the two core routers goes down.

Open the dashboard →
Example run: risk low, score 12.2Thumbnail of the topology with 3 affected nodes highlighted, and the risk score 12.2 out of 100 in the low band.Low risk12.23 of 26 nodes affected0100
Campus networkStaff prefers core2

An OSPF cost is raised so staff traffic moves to the second core.

Open the dashboard →
Example run: risk critical, score 54.9Thumbnail of the topology with 17 affected nodes highlighted, and the risk score 54.9 out of 100 in the critical band.Critical risk54.917 of 26 nodes affectedband raised by a hard rule0100
Campus networkStaff host moved to the guest VLAN

A switch port is retagged into the guest VLAN.

Open the dashboard →
Example run: risk critical, score 43.0Thumbnail of the topology with 16 affected nodes highlighted, and the risk score 43.0 out of 100 in the critical band.Critical risk43.016 of 26 nodes affectedband raised by a hard rule0100
Campus network with access listsGuest uplink failure

The run followed above.

Open the dashboard →
Example run: risk high, score 23.1Thumbnail of the topology with 8 affected nodes highlighted, and the risk score 23.1 out of 100 in the high band.High risk23.18 of 18 nodes affectedband raised by a hard rule0100
Leaf-spine fabric (BGP)Leaf 3 BGP sessions shut down

Both BGP sessions of one leaf switch are shut.

Open the dashboard →

Throughput is from a scaled emulation (S = 1/100): ratios and congestion onset hold, absolute bandwidth does not.

See what was measured.