Vlan staff1 to guest
The score alone sits in the high range; hard rules raised the band to critical. Rules can only raise a band.
What happened between guest1 and staff1
Before the change reachable
After the change lost
- Evidence 1 'guest1' can no longer reach 'staff1'.
Schematic. The evidence lines above come from the run data. The run did not record the hop-by-hop route, so each route is drawn from the network description as the fewest-hop one. Other devices and hosts are omitted.
How 55 became critical
- A policy rule is now broken: critical
- A service went down: at least high
- Hosts lost connectivity: at least high
- The change touches a large part of the network: critical
The score alone gives high; the critical band comes from the hard rules. The factors add up to 55.0 points of the 54.9 score (rounding).
Why it scored 55
Each bar shows how much of a factor's maximum share of the 100 points it used. The factors add up to the score of 55.
Share of the network's declared services that stopped working
Reference F-SVC, weight 0.25, measured value 1
Share of devices the change touches
Reference F-BLAST, weight 0.15, measured value 0.615
Share of your declared policies (who may reach whom) now violated
Reference F-INTENT, weight 0.2, measured value 0.308
Share of host-to-host connections lost or degraded
Reference F-REACH, weight 0.2, measured value 0.125
Redundancy removed: traffic now has fewer alternative routes
Reference F-REDUN, weight 0.1, measured value 0
Links pushed toward overload (shown as "not measured" when unmeasured). Not measured in this run, so it adds nothing to the score.
Reference F-CONG, weight 0.1, measured value 0
Rules that set a minimum band
Any newly broken policy makes the change critical. It raised the band.
Evidence 19 Evidence 20 Evidence 21 Evidence 22
Reference HR-1: A declared intent (policy requirement) was newly violated by this change.
A declared service is no longer reachable.
Evidence 16 Evidence 17 Evidence 18
Reference HR-2: A declared service became unreachable.
At least one pair of hosts that could talk before cannot now.
Evidence 1 Evidence 2 Evidence 3 Evidence 4 Evidence 5 Evidence 6 and 9 more
Reference HR-3: At least one host pair that could reach each other before can no longer reach each other.
The change touches 62% of devices; from 50% up it is critical on its own. It raised the band.
Evidence 1 Evidence 2 Evidence 3 Evidence 4 Evidence 5 Evidence 6 and 12 more
Reference HR-4: Change touched 62% of the topology's nodes - a large enough blast radius to escalate independently of the weighted score.
If a factor were left out
The score and band without that one factor. Hard rules stay as they are.
| Factor left out | Score | Band |
|---|---|---|
| Services affected | 29.9 | critical |
| Connections lost | 47.9 | critical |
| Policy rules broken | 43.8 | critical |
| Backup paths lost | 54.9 | critical |
| Spread of the change | 43.2 | critical |
| Congestion | 54.9 | critical |
Plain-language explanation
Explore this run
Topology
What changed
Hosts affected
| From | To | Result | Evidence |
|---|
Routes affected
| From | To | Hops before | Hops after | Evidence |
|---|
Services affected
| Service | Worked before | Works now | Latency (ms) | Consumer VLANs | Evidence |
|---|